<< To Portfolio List

ZERUST® Corrosion Mitigation for Underground Pipe Casing with Residual Water Presence in Illinois, USA

ZERUST solutions overcoming residual water challenges in underground casings

Project Details

Location: Illinois, USA

Date: December 2024

Contractor: TerraWorks LLC

Client: Confidential

 

Project Summary

ZERUST® Integrity Solutions (ZIS), in partnership with TerraWorks LLC, implemented a corrosion mitigation system for a 36-inch x 30-inch underground pipe casing. The project included site assessment, injection of a customized corrosion inhibitor solution, and installation of monitoring equipment. The goal was to extend the service life of the casing and provide ongoing monitoring capability.

 

Asset & Site Details

  • Asset ID: Pipe Casing

  • Casing Diameter: 36 inches (≈ 914 mm)

  • Pipeline Diameter: 30 inches (≈ 762mm)

  • Length: 198 feet (≈ 60.3 meters)

  • Vent Pipes: Two 2-inch (Top orientation) (≈ 51 mm)

  • Elevation Changes: Minimal

  • Weather During Application: Visit 1: 17°F (-8°C), 45% humidity, Sunny. Visit 2: 43°F (6°C), 70% humidity, Fog, Cloudy

 

Solution Implemented

Products Used
ZERUST® Zerion FVS Corrosion Inhibitor Powder
ZERUST® Zerion PGH-300 Gel and PGH-400 Gel Powder

Monitoring

  • Electrical Resistance (ER) Corrosion Monitoring Probe (CT-20, 20-ft cable length)
  • Enardo Lever-Type Pressure Relief Valve

Implementation Details
Injection was delayed until excavation was complete. During the second visit, residual water was identified and treated with a 10% corrosion inhibitor solution formulated with ZERUST® Zerion FVS-S15 Corrosion Inhibitor Powder and ZERUST® ZerionPGH-300 and PGH-400 Gel Powders, injected in 250-gallon intervals using a 2-inch Eductor system. A total of 975 gallons (3,690 liters) was applied, displacing ~5 gallons (19 liters) of water. The ER Probe and Pressure Relief Valve were installed, and site personnel received IDS training.

 

Outcome

The corrosion mitigation solution was successfully implemented at adjusted concentrations. Monitoring equipment is now in place, and ongoing data collection from the ER Probe will enable continued performance analysis. The project positions the asset for extended service life and reduced corrosion risk.

 

Download Case Study PDF

Click Here >>>

 

For More Information

Contact a ZERUST® representative regarding any questions about this report.